Lift station drawdown test sheet

Test sheet

Lift station drawdown test sheet

The Columbus Pump Stations • 70 pumps in 24 stations • Storm water and wastewater • 5 to 500 horsepower • 4 inch to 48 inch discharge. Lift station drawdown test sheet. 2 Observed Lift Station Capacity. _ _ sheet _ _ _ ft3 X 7. A drawing on the sheet explains their use. The survey drawings of the lift station are presented in Attachment E. 48= _ _ drawdown _ _ _ gallons. Sept - Lift Station Level Control - Almost.

sheet Drawdown is usually measured in feet or meters. I' d do a drawdown test to. The Drawdown combo calculator is designed for older wells that use a partition to accommodate both wet and dry sheet pits in the same well. Report all problems with the lift station to the operations supervisor. 3 GPM 3 300 gallons per day. sheet sheet The drawdown testing of this lift station was carried out over an 11- day period from March 14 to.

The locations of incoming sewers manholes were recorded also surveyed. In a step- drawdown test, the discharge rate in the pumping well is increased from an initially low constant rate through a sequence of pumping intervals ( drawdown steps) of progressively higher constant rat. Respond to sheet all lift station alarms. Included at the end of this manual is a start- up report sheet. A step- drawdown test ( or step test) is a single- well pumping test designed to investigate the performance of a pumping well under controlled variable discharge conditions. What is " drawdown? Allow the water level to return to the original height and record the time.

the lift station sheet , standby generator access road. The draw test down test is conducted to measure the pumping rate in order to verify that the pumps will operate at the specified flow requirements. The peak sheet lift station flow in gpm is used to determine the appropriate sized pump to use for bypassing flow from the sheet lift station. This test is an important part of commissioning new lift stations and there are things to consider onsite to complete this test. Collection Systems Technology Fact Sheet Sewers, Lift Station DESCRIPTION Wastewater lift stations are facilities designed to move wastewater from lower to higher elevation through pipes. The first requirement for the draw down test is having water available onsite. guide is an introduction to well drawdown. flow for this lift station is approximately 8 GPM which equates to 11 500 gallons per day. Test Your Knowledge – Calculating a Draw Down Test at a Lift Station Posted on August 4 Calculating a Draw Down Test at a sheet Lift Station, by KYDEP Now that you have read the post try working the following practice problem on your own. The field- test for the Main Lift Station was now complete. Maintain all required lift station field logs. On the following pages tips for recording , ways to make drawdown measurements , you will learn the basic vocabulary of drawdown using your findings. Do not lift pump by the power cord. Aug 04 · The lift station has sheet a diameter of 10 feet a depth of 25 feet.


Pump Field Test Calculator. 48 gallons in a cubic foot! Key elements of lift stations include a wastewater receiving well ( wet- well),. A 50- HP Crown submersible pump ( Model 5 CH225 STD) that was provided by the Blue Star well - drilling sheet company and test employed for initial well development activities was used to perform the step- drawdown test. Drawdown Volume = L X W X H Rectangular Formula- Answer in ft3_ _ _ _ _ This will get you drawdown to Cubic Feet now convert Cubic Feet to Gallons 7. A pumping test is a field experiment in which a well drawdown is pumped at a controlled rate evaluate well performance , water- level response is measured in one , more surrounding observation wells , optionally in the pumped well ( control well) itself; response data from pumping tests are used sheet to estimate the hydraulic properties of aquifers identify aquifer boundaries. Lift station drawdown test sheet.

" Drawdown is the drop in the level of water in a well when water is being pumped. PUMP STATION START- UP and TROUBLESHOOTING MANUAL. sheet Pumping Rate= Drawdown Volume + Refill Volume Drawdown Time Refill Time 1. As soon as the drawdown ends, the fill up begins. Subjects covered will include types of lift stations lift station operating principles, routine PM requirements , components basic drawdown troubleshooting techniques. 785 X D X D drawdown X H sheet Cylindrical 1a. This compares with the average flow rate recorded for this lift station during the drawdown testing of 2. Drawdown Volume =. Record all problems or observations at the lift station in the lift station journal. This one- day class is designed to give the student an overview of the day- to- day operation and maintenance of wastewater lift stations. The influent flow to the lift station rises with the pump running, at a rate of 8 feet in 10 minutes , with no pump running the rise rate is 5 feet in 10 minutes.


Drawdown test

Pump Station Design Guidelines – Second Edition Jensen Engineered Systems 825 Steneri Way Sparks, NV 89431. OVERVIEW OF A TYPICAL JES SUBMERSIBLE LIFT STATION. The pumps' corrosion- resistant construction makes them highly durable in wastewater applications where low- head pumps are suitable. Technical Data Sheet.

lift station drawdown test sheet

curve for a duplex lift station that was designed to pump 400 GPM into a gravity main against a static head of 48 feet. spread sheet on the “ Pump Sizing, Selection & Testing Tools” page at PumpEd101. This can increase drawdown accuracy in smaller wet wells.